can anyone verify my maths?
I can.
What now needs to be calculated is the capex expenditure required to bring each of those 20 wells into production ..and in particular the expenditure on vacuum pumps. And then we need to calculate the operating expenditures associated with maintaining these pumps in good working order. It is inevitable that at some times a pump will fail and need to be replaced . What impact could this interruption have on the dynamics of the reservoir below ?
BNL directors have shared too late this new complication - vacuum pumps- arising from low pressure. Maybe they will share a feasibility study into this additional, necessary process. Maybe they need to assess the viability of improving flow through stimulating the formation with perforations of the well bore.
- Forums
- ASX - By Stock
- BNL
- Ann: Update on Bolling 4 Evaluation
Ann: Update on Bolling 4 Evaluation, page-18
-
-
- There are more pages in this discussion • 62 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BNL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
-0.001(25.0%) |
Mkt cap ! $7.293M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.3¢ | $1.21K | 320K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
64 | 56272592 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 18649243 | 16 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
64 | 56272592 | 0.003 |
23 | 24786892 | 0.002 |
12 | 52533025 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 18649243 | 16 |
0.005 | 10663171 | 13 |
0.006 | 5959735 | 7 |
0.007 | 2726271 | 5 |
0.008 | 4382001 | 8 |
Last trade - 10.11am 10/10/2024 (20 minute delay) ? |
Featured News
BNL (ASX) Chart |
The Watchlist
EL8
ELEVATE URANIUM LTD
Murray Hill, MD & CEO
Murray Hill
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online