Morning Spid. You have no idea on what machines they have on site and when they were replaced. The first thing that goes out the door when lack of funding is the maintaining of the emv fleet. In 2 years a 75 ton excavator, 966 loader, 140h grader and a 12t roller have been purchased. Plus 3 775 rigid trucks that were onsold. These were intended for the inlandvstrand. 4 745 artic trucks are about 4 yesrsbold, hardly at the end of there us by date. ps the 740b truvks on site are about 8 years old. all smoke and mirrors.
- Forums
- ASX - By Stock
- MRC
- Ann: Production Delays - Tormin Mineral Sands
Ann: Production Delays - Tormin Mineral Sands, page-22
-
- There are more pages in this discussion • 57 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MRC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.59M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MRC (ASX) Chart |
Day chart unavailable