Does the below bode well for SYA ! Hanging in tight
Closing the Lithium Conversion GapThe East Coast of North America is set to witness a substantial surge in battery manufacturing, with over 20 major battery manufacturers planning to deploy an estimated 900GW of battery capacity by 2028. By 2030, Georgia, Kentucky, and Michigan are poised to dominate electric vehicle (EV) battery production in the United States, joined by key players such as Kansas, North Carolina, Ohio, and Tennessee. These states aim to collectively manufacture between 97 and 136 gigawatt hours of EV batteries annually. To meet the escalating demand for EVs, North America's EV battery manufacturing capacity will skyrocket from 55 gigawatt-hours in 2021 to nearly 1,000 gigawatt-hours by 2030, requiring an investment exceeding $40 billion. This strategic expansion is expected to support the production of 10 to 13 million all-electric vehicles annually by 2030, positioning the U.S. as a formidable global EV competitor. Additionally, Canada's recent focus on investing in battery plants, backed by collaborations with Volkswagen, Stellantis, LG Energy Solution, and Northvolt, aims to safeguard its auto sector, potentially creating 250,000 jobs and contributing $48 billion annually to the economy by 2030.The industry encounters a significant challenge in establishing a reliable supply chain, especially due to limited access to lithium converters in North America. The region seeks to decrease dependence on China and Chinese companies, aligning with both commercial and national security goals. Presently, Chinese companies dominate the global market for lithium converters and refining capacity.
Similarly, Canada, acknowledging the significance of energy security, has intensified efforts to reduce Chinese involvement in the sector as part of a "decoupling" or "de-risking" strategy, mirroring the actions taken by the United States. The issue lies in the scarcity of independent lithium converters planned for construction in North America, potentially stemming from a lack of expertise or a series of recent failures and delayed startups in the sector. A significant gap in lithium conversion and processing looms in North America. Assuming the planned battery manufacturing capacity of 900 GW by 2028, using a ratio of 850g lithium carbonate equivalent (LCE) per KWh, the Company estimates that 800,000t of LCE per annum will be required to satisfy demand in North America
https://hotcopper.com.au/threads/ann-quebec-prime-industrial-land-secured-for-lithium-refinery.7859521/
- Forums
- ASX - By Stock
- SYA
- Ann: Moblan Lithium Project Definitive Feasibility Study
Ann: Moblan Lithium Project Definitive Feasibility Study, page-192
-
- There are more pages in this discussion • 53 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SYA (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.6¢ |
Change
0.003(9.09%) |
Mkt cap ! $370.5M |
Open | High | Low | Value | Volume |
3.3¢ | 3.7¢ | 3.2¢ | $2.985M | 85.61M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 4176281 | 3.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.6¢ | 546675 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
9 | 4126281 | 0.035 |
13 | 4271453 | 0.034 |
32 | 12081348 | 0.033 |
71 | 14499876 | 0.032 |
36 | 9777461 | 0.031 |
Price($) | Vol. | No. |
---|---|---|
0.036 | 546675 | 2 |
0.037 | 10478059 | 38 |
0.038 | 16389346 | 31 |
0.039 | 5671797 | 19 |
0.040 | 6594768 | 34 |
Last trade - 16.10pm 16/10/2024 (20 minute delay) ? |
Featured News
SYA (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online