EGR 0.00% 13.5¢ ecograf limited

Ann: Collaboration with BASF on Anode Recycling, page-58

  1. 190 Posts.
    lightbulb Created with Sketch. 286
    The product qualification facility is likely the old laboratory facility from Christoph Frey, which was operated for a period of time in Germany as a "pilot plant." The equipment fits into a container. Presumably, the equipment needs to be cleaned, the container shipped, and a plot of land with electricity and water connections found in Australia to re-establish the facility. Then, a fluffy announcement: "Product Qualification Facility built and ready to run," and Andrew can celebrate once again.
    It would be better to let the container in Germany and place it in Schwarzheide or Ludwigshafen on the BASF ground to conduct tests together with the new MOU partner BASF.
 
watchlist Created with Sketch. Add EGR (ASX) to my watchlist
(20min delay)
Last
13.5¢
Change
0.000(0.00%)
Mkt cap ! $61.29M
Open High Low Value Volume
13.5¢ 13.5¢ 13.5¢ $12.57K 93.16K

Buyers (Bids)

No. Vol. Price($)
7 214000 13.0¢
 

Sellers (Offers)

Price($) Vol. No.
14.0¢ 93402 4
View Market Depth
Last trade - 16.10pm 19/06/2024 (20 minute delay) ?
EGR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.