MAY 3.13% 3.1¢ melbana energy limited

Cuba Block 9: Alameda-3 Drilling Update 29 February 2024, page-60

  1. 6,510 Posts.
    lightbulb Created with Sketch. 1270
    A 12 time increase would be twice as massive as a 6 time increase and 4 times more massive than a 3 time increase and a lot more optimistic than way too optimistic. No idea what’s more likely.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.1¢
Change
-0.001(3.13%)
Mkt cap ! $107.8M
Open High Low Value Volume
3.0¢ 3.2¢ 3.0¢ $23.28K 750.8K

Buyers (Bids)

No. Vol. Price($)
7 145763 3.1¢
 

Sellers (Offers)

Price($) Vol. No.
3.2¢ 1213341 6
View Market Depth
Last trade - 14.04pm 11/11/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.