Why will LTR be a high cost producer???
Look at power....
Zenith paid for and own the solar farm, wind turbines, battery storage….
They also own the diesel/gas generators.....
These generators can provide 100% of power requirements....
Zenith charge LTR by kwh used......
They have to recoup their costs......
This price is higher than if they only had fossil fuel generation like Wodgina…..
Then UG uses more power than open pit.. ventilation etc....
Core and SYA production cost is well above market price....
LTR will be worse.......
Longer transport distance....
Massive loans to repay.....
More expensive Flotation....
Relying on unreasonable recovery rates.....
Way above even Greenbushes who have superior grades.....
Gina is well aware of all this......
- Forums
- ASX - By Stock
- LTR
- ASX Today
ASX Today, page-38409
-
- There are more pages in this discussion • 5,998 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
67.0¢ |
Change
-0.045(6.29%) |
Mkt cap ! $1.624B |
Open | High | Low | Value | Volume |
70.0¢ | 71.0¢ | 67.0¢ | $10.52M | 15.42M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 385809 | 66.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
67.5¢ | 116000 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 62320 | 0.665 |
12 | 266032 | 0.660 |
3 | 18625 | 0.655 |
23 | 225249 | 0.650 |
3 | 71550 | 0.645 |
Price($) | Vol. | No. |
---|---|---|
0.675 | 11000 | 2 |
0.680 | 189500 | 3 |
0.685 | 50001 | 2 |
0.690 | 35935 | 3 |
0.695 | 20000 | 1 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
LTR (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online