WR1 8.15% 73.0¢ winsome resources limited

Ann: Main Zone extended to 2.11km by systematic drilling at Adina, page-45

  1. 348 Posts.
    lightbulb Created with Sketch. 98
    Our starter pit alone is potentially 15 years of low strip, thick, high grade DMS amenable spod that starts at surface. We are looking a very strong chance of being in the lowest cost production quartile for hard rock mines. LTR has done amazing things and has a head start, but WR1/Adina has a lot of attributes that most can only dream of.
 
watchlist Created with Sketch. Add WR1 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.