In a DFS, the forecast price of lithium is assumed at the time of mining and commissioning of the mine, not the current market price at the time a DFS is created.
The updated DFS can be created if the energy costs of the hydroxide plant in Saudi Arabia are known, as this results in the new OPEX.
In addition, the logistics costs for transportation to Saudi Arabia must be taken into account, forecast for 20XX.
Without finalization of the JV contract between CRML and Obeikan everything is open.
- Forums
- ASX - By Stock
- EUR
- General Discussion
General Discussion, page-818
-
-
- There are more pages in this discussion • 863 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $51.73M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
EUR (ASX) Chart |
Day chart unavailable