MAY 0.00% 2.1¢ melbana energy limited

Cuba Block 9 Operations Update, 12 March, page-7

  1. 6,501 Posts.
    lightbulb Created with Sketch. 2460
    Everything makes sense now.

    1) No separator on site for Alameda/Marti.
    2) Was the reason for no ASX announcements/promotion/webinars that they didn't want to then announce the separator was not ready? hence, killing momentum?
    3) Was drilling intentionally slowed/stopped to account for the separator delay? (to preserve the hole from degradation over time of the most prospective sections?).

    The only positive I get out of all of this is the engineers presumably know they needed a higher pressure, higher volume separator compared to whatever they used for Amistad (that is quite bullish). The mathematics/engineering requirements don't lie.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.1¢
Change
0.000(0.00%)
Mkt cap ! $70.77M
Open High Low Value Volume
2.1¢ 2.3¢ 2.1¢ $91.04K 4.108M

Buyers (Bids)

No. Vol. Price($)
15 2121433 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 1168000 4
View Market Depth
Last trade - 16.10pm 15/08/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.