Hi Feral, the 500mMD gross interval is just in the Alameda 'N' Sheet. There is further logged pay in the Marti structure deeper still...
From ASX 1 Feb 2022;
" Ideally, this would have involved each of the three objectives being intersected at the top of their structures. However, designing a well plan involves compromise, and thus, based on the geological mapping, the N structure would have to be intersected at a less than optimal location, being "down dip" from the top of the structure. The potential upside in this scenario, however, is that finding even a thin oil column in the N objective at the current location could indicate a significant resource "updip" of the wellbore."
The N structure goes off seismic to the east and west and is further mapped by old dynamite lines to the south; the resource could be significant. Lets hope it flows like the clappers
- Forums
- ASX - By Stock
- MAY
- Cuba Block 9 Operations Update, 12 March
Cuba Block 9 Operations Update, 12 March, page-87
-
-
- There are more pages in this discussion • 141 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $67.40M |
Open | High | Low | Value | Volume |
2.0¢ | 2.1¢ | 2.0¢ | $37.57K | 1.856M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
37 | 11509043 | 2.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.1¢ | 1523856 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
33 | 11229043 | 0.020 |
9 | 1025920 | 0.019 |
3 | 358730 | 0.018 |
3 | 80355 | 0.017 |
3 | 1725000 | 0.016 |
Price($) | Vol. | No. |
---|---|---|
0.021 | 1523856 | 5 |
0.022 | 2516137 | 8 |
0.023 | 3200000 | 5 |
0.024 | 2472742 | 6 |
0.025 | 1266441 | 5 |
Last trade - 16.10pm 09/08/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |