BUR 0.00% 6.8¢ burley minerals ltd

frac ann out now

  1. 1,240 Posts.
    lightbulb Created with Sketch. 2
    New Ann out see below...


    RESUMPTION OF DRILLING, ONSHORE TEXAS
    (ASX: BUR)
    Burleson Energy is pleased to advise the imminent resumption of drilling activity in its
    Colorado County, onshore Texas, project area.
    Two wells are planned:
    1. The first will be an exploration well targeting an independent Wilcox structure
    several alternative highly prospective targets are available, and a decision on the
    actual target will be made shortly.
    2. The second will be a Heintschel #2 appraisal well (contingent to a degree on the
    results of the Heintschel #1 frac).
    The reason for the change in plans is that frac equipment remains in short supply, and the
    anticipated mid-September frac of the Heintschel #1has come and gone. In that regard,
    BUR advises that a firm frac date for the Heintschel #1, of November 26, has now been
    committed - but an earlier slot is possible. The frac will provide vital data regarding the
    viability of, and how best to develop, this potentially large resource of 60 Bcf +30 Bcf of
    gas plus 1 mmb +0.5 mmb of condensate. BUR and AKGs preference is to secure these
    data before proceeding with development drilling. The above drilling timetable allows
    sufficient time for a Heintschel #1 frac to occur and to assess the results before Heintschel
    #2 is drilled.
    Both offset development and appraisal drilling locations are currently being prepared on
    the Heintschel structure.
    ABN 73 117 770 475
    Burleson Energy Ltd
    Registered Office /
    Administration
    Level 6
    9 Barrack Street
    SYDNEY NSW 2000
    Australia
    Mailing Address
    GPO Box 92
    SYDNEY NSW 2001
    Australia
    Phone: +61 2 8252 6177
    Facsimile: +61 2 8252 6178
    www.burlesonenergyltd.com
    Page 2
    There are several candidates for the next Wilcox exploration well including:
    Recently identified Wilcox prospects with potential for ~10 Bcf of gas and 0.3 mmb
    condensate (BUR WI 36%)
    WH 4 Wilcox prospects in Wharton County in additional acreage acquired in Jan
    2010 have potential for 41 Bcf gas (BUR WI 36%).
    Moeller prospect is located 53m updip of the Moeller 1 well which encountered
    good hydrocarbon shows but apparently in a gas water transition zone. The up dip
    location has the potential to contain 10.4 Bcf gas and 0.24 mmb condensate (BUR
    WI 38%).
    The operator AKG has commenced sourcing a suitable rig to drill two wells, with drilling
    expected to commence within 4 to 8 weeks weeks. The new well(s) will also require
    fraccing.
    Note that AKG has six previous bookings with frac units, so it is possible that two (or more)
    wells could be fracced in sequence.
    An updated investor presentation, including updates on other BUR wells, will be released
    to the ASX, and uploaded to the BUR website, shortly.
    For further information, please contact:
 
watchlist Created with Sketch. Add BUR (ASX) to my watchlist
(20min delay)
Last
6.8¢
Change
0.000(0.00%)
Mkt cap ! $10.22M
Open High Low Value Volume
6.9¢ 6.9¢ 6.8¢ $11.80K 172.8K

Buyers (Bids)

No. Vol. Price($)
2 64404 6.8¢
 

Sellers (Offers)

Price($) Vol. No.
7.3¢ 38000 1
View Market Depth
Last trade - 14.58pm 15/11/2024 (20 minute delay) ?
BUR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.