-
Share
5,087 Posts.
123
18/03/24
17:22
Share
sonic, trans grid only manages NSW and ACT.
It is majority owned by a french canadian pension fund btw.
Most of it's lines are currently Cat 2 and Cat 3.
Humlink will be Cat 1 , IE: 500kv. Bloody massive
Many existing lines will need Cat upgrade to effectively distribute new generation including roof top solar into the grid.
Plus all the batteries, wind and solar farms need plugging in.
Then include SA, Vic and Qld. Same deal. But not by tg.
-