MAY melbana energy limited

Ann: Block 9 - Maiden Contingent Resources, page-93

  1. 989 Posts.
    lightbulb Created with Sketch. 291
    The well head will have chokes to control pressure as per normal. bop is only used when needed in an uncontrolled well. The well is always flowing back drilling fluids whilst drilling. Once the cement liner is complete above the resevoir the plug will be drilled out and the well head shut in and pressures tested. It is only in the case of the well head failure that the bop is used.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
2.3¢
Change
0.002(9.52%)
Mkt cap ! $77.51M
Open High Low Value Volume
2.2¢ 2.3¢ 2.1¢ $62.26K 2.871M

Buyers (Bids)

No. Vol. Price($)
1 909090 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 931186 2
View Market Depth
Last trade - 16.10pm 27/06/2025 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.