Hi Fulang,
You really need to read the announcements, MRC had already advised the delays with processing will be minimal.
Potential production impacts
While the investigation, inspection and assessment of repairs are being conducted, alternative
water arrangements are being planned to allow production to continue with every effort being
made to minimise the impact on volumes. Options being assessed include diverting seawater
intake to the lower capacity settlement ponds, processing beach material and reprocessing of
mined grade coarse tailings and beach / garnet material through the GSP.
Anyway, my reading of the satellite images shows the dam had already been drained and the company has started to refill the dam.
- Forums
- ASX - By Stock
- MRC
- Ann: Production Delays - Tormin Mineral Sands
Ann: Production Delays - Tormin Mineral Sands, page-65
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MRC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.59M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MRC (ASX) Chart |
Day chart unavailable