"The production simulations show brine abstraction for 12,000tpa lithium carbonate production can be sustained for 42 years and brine abstraction for 24,000tpa can be sustained for 22 years. The development of third-party projects on the Salar del Rincon may affect both the number of bores required to maintain a specific production rate and/or restrict the annual production rate such that it takes longer to recover the brine resources contained within Argosy’s project. Regardless, it is simulated that in all cases, between 660,000 tonnes lithium carbonate and 680,000 tonnes lithium carbonate can ultimately be recovered."
Multiple decades worth, we might just need some more bores down the track.
- Forums
- ASX - By Stock
- AGY
- Ann: Dynamic Modelling Produces Outstanding Results at Rincon
Ann: Dynamic Modelling Produces Outstanding Results at Rincon, page-54
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AGY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.7¢ |
Change
0.001(2.78%) |
Mkt cap ! $53.86M |
Open | High | Low | Value | Volume |
3.6¢ | 3.7¢ | 3.6¢ | $83.96K | 2.279M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 13371 | 3.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.8¢ | 1738141 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 13371 | 0.037 |
14 | 1237028 | 0.036 |
25 | 2953989 | 0.035 |
12 | 1886596 | 0.034 |
10 | 1572268 | 0.033 |
Price($) | Vol. | No. |
---|---|---|
0.038 | 1738141 | 6 |
0.039 | 1512481 | 8 |
0.040 | 445175 | 2 |
0.041 | 510322 | 5 |
0.042 | 306466 | 5 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
AGY (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online