@Croc-file @Fulang66
As I said, the Satellite images showed the dam had been lowered and refilled, we have the confirmation today that these works have been completed with one final repair required. We also have the confirmation of the limited down time of the two PBC and the processing facilities.
Add to My Watchlist
What is My Watchlist?