I must say though, that if MMA are looking for toll milling arrangements for the Maronan project, then they are probably doing so because they believe that the scoping study may indicate that the economics do not justify the costs incurred to build the mine infrastructure. After all, the Maronan project should be a 20+ year operation. They need to get the silver and gold concentrate recoveries up imo.
- Forums
- ASX - By Stock
- MMA
- Ann: Very Positive Preliminary Metallurgical Test Work on Maronan
Ann: Very Positive Preliminary Metallurgical Test Work on Maronan, page-8
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MMA (ASX) to my watchlist
(20min delay)
|
|||||
Last
22.5¢ |
Change
-0.005(2.17%) |
Mkt cap ! $45.28M |
Open | High | Low | Value | Volume |
23.0¢ | 23.5¢ | 21.5¢ | $80.64K | 354.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 13450 | 21.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
23.0¢ | 10917 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 13450 | 0.215 |
5 | 27150 | 0.210 |
2 | 104800 | 0.205 |
3 | 57500 | 0.200 |
1 | 2000 | 0.190 |
Price($) | Vol. | No. |
---|---|---|
0.230 | 10917 | 1 |
0.235 | 16135 | 1 |
0.240 | 10839 | 1 |
0.250 | 11000 | 1 |
0.255 | 2500 | 1 |
Last trade - 15.40pm 26/07/2024 (20 minute delay) ? |
Featured News
MMA (ASX) Chart |