Sounds easy to just chuck a generator onsite and then twist a few wires together on the 33KV CCT and then just turn on the switch.....
This is a pick of a 50MW Combined Cycle Gas fired turbine plant.
The building on the left where the two bright lights are shining is the Turbine Hall. The structure in front of you is the Exhaust Gas to Steam plant which provides the MD pressure stem to drive the second stage of the Combined Cycle Plant. This combined with Gas Separator Plant plus water cooling plant takes up quit a bit of space, and not a five minute job to build. Just the plinth for the turbine & generator beds would take around 8 months to build.
It is a very specialist area to construct and our position would best be to invest in the power plant and supply gas from the Separator plant.
- Forums
- ASX - By Stock
- IVZ
- Ann: Gas Sales Agreement to Deliver Power to Eureka Gold Mine
Ann: Gas Sales Agreement to Deliver Power to Eureka Gold Mine, page-205
-
- There are more pages in this discussion • 87 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.2¢ |
Change
0.001(1.64%) |
Mkt cap ! $87.91M |
Open | High | Low | Value | Volume |
6.3¢ | 6.3¢ | 6.1¢ | $61.7K | 998.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 220644 | 6.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.2¢ | 101155 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 220644 | 0.061 |
9 | 74626 | 0.060 |
5 | 918474 | 0.059 |
4 | 308237 | 0.058 |
4 | 128000 | 0.057 |
Price($) | Vol. | No. |
---|---|---|
0.062 | 101155 | 1 |
0.063 | 41433 | 3 |
0.064 | 840000 | 3 |
0.065 | 772129 | 6 |
0.066 | 965000 | 3 |
Last trade - 16.10pm 27/06/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |