IVZ 3.70% 5.6¢ invictus energy ltd

Ann: Gas Sales Agreement to Deliver Power to Eureka Gold Mine, page-211

  1. 682 Posts.
    lightbulb Created with Sketch. 78
    they can build much smaller pure gas turbine plants without the boiler (the heat exchanger / big thing in the picture).

    This is a much smaller solution and arguable modular and much easier to stand up than a combined plant (and probably make most sense when looking at a smaller solution).

    Combined plants, which is what Brent has posted is a gas turbine with a boiler too, to recover the heat then this is cycled through a steam turbine.

    Smaller option is only 30-40% efficient in power generation. Conbined plants are 50-60% I believe so obviously the greenest option.

    100% Combined cycle plant makes sense for bigger plants. But I think you can go smaller with just gas turbines to get up and running. Then move to Combined cycle (gas turbine + recovery heat exchanger + steam turbine) for larger plants to maximize the efficiency.

    gas turbines alone will be a much cheaper option.

    Correct me if I'm wrong Brentb?
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
5.6¢
Change
0.002(3.70%)
Mkt cap ! $79.40M
Open High Low Value Volume
5.6¢ 5.7¢ 5.4¢ $153.5K 2.775M

Buyers (Bids)

No. Vol. Price($)
1 49999 5.6¢
 

Sellers (Offers)

Price($) Vol. No.
5.7¢ 35000 1
View Market Depth
Last trade - 16.10pm 14/06/2024 (20 minute delay) ?
Last
5.7¢
  Change
0.002 ( 5.17 %)
Open High Low Volume
5.4¢ 5.8¢ 5.3¢ 999121
Last updated 15.36pm 14/06/2024 ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.