Partial tunnel collapse at Snowy 2.0 construction site raises fresh safety concerns, page-14

  1. 20,731 Posts.
    "there was some test drilling done to test the ground"

    Not extensive enough obviously.
    Takes time and costs money but in this case it would have been money well spent to get the best alignment for the tunnel.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.