AVL 0.00% 1.4¢ australian vanadium limited

Ann: 39% Increase in HG Measured and Indicated Mineral Resource, page-34

  1. 4,056 Posts.
    lightbulb Created with Sketch. 1114
    These are my estimations based on the TMT mineral ore reserve table. It is a starting point.

    V205 Estimation:


    105 Million Tonnes * 1million = 105 Million Tonnes

    105 Million Tonnes * 44.4% (Mass Yield Recovery from the TMT Mineral Reserve Table)

    = 46.62 Million Tonnes (Magnetic Concentrate) * 0.016 (Magnetic Concentrate Grade)

    = 745000 Tonnes / 12,000 Tonnes per Year Production

    = 62 Years of High Grade V205 Production.

    Ilmenite Estimation

    105 Million Tonnes * 1million = 105 Million Tonnes

    105 Million Tonnes * 56.6% (Mass Yield Recovery from the TMT Mineral Reserve Table)

    = 59.43 Million Tonnes (Non-Magnetic Concentrate)

    59.43 Million Tonnes (Iron / Titanium) * 12.35% Illmenite (TMT grade) = 7.33 Million Tonnes

    7.33 Million Tonnes / 62 Years of High Grade Material above

    = 229,062 Tonnes of Illmenite Production per year based on a 12,000 per Year Run Rate.

    Iron Estimation:

    105 Million Tonnes * 1million = 105 Million Tonnes

    105 Million Tonnes * 56.6% (Mass Yield Recovery from the TMT Mineral Reserve Table)

    = 59.43 Million Tonnes (Non-Magnetic Concentrate)

    = 59.43 Million Tonnes (Iron / Titanium) * 87.65% Illmenite (Minus Ilmenite Grade Above) = 52.09 Million Tonnes

    = 52.09 Million Tonnes * (Assumed Optimizing Yield 80%)

    = 41.672 Million Tonnes / 62 Years

    = 670,00 Tonnes per Annum 60 Fe Production

    20% Waste Material (Iron Low Grade)

    This does not account for the low grade deposits just the high grade 105Mt Component.



 
watchlist Created with Sketch. Add AVL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.