150ppm is 316.5mg/ltr OR .000316kg/ltr - based on Lithium Carbonate density of 2110kg/m3
.54 cmtr/sec = 540 ltrs/second - flow allowance
540 x .000316/ kg / second OR .1706kg/sec
recovery is ~90% so .153kg/sec
If we assume the plant can keep up with the flow then
9.21kg/min OR 550 kg/hr OR 3.8tonnes for a 7hr shift OR 11.6 tonnes/day (working 24hrs) OR 4,200 tonnes a year (24/7 365)
I still must be missing something. Those with the bigger numbers can you give me your working assumptions. How are you getting to numbers like 380g/sec?
- Forums
- ASX - By Stock
- ASN
- Ann: Approval from State of Utah for Brine Extraction -GreenRiver
Ann: Approval from State of Utah for Brine Extraction -GreenRiver, page-35
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
|
|||||
Last
13.0¢ |
Change
0.010(8.33%) |
Mkt cap ! $167.7M |
Open | High | Low | Value | Volume |
12.5¢ | 13.0¢ | 12.3¢ | $246.2K | 1.938M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 56101 | 12.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.0¢ | 270228 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 56101 | 0.125 |
4 | 165000 | 0.120 |
13 | 582348 | 0.115 |
6 | 452527 | 0.110 |
10 | 419286 | 0.105 |
Price($) | Vol. | No. |
---|---|---|
0.130 | 270228 | 4 |
0.135 | 994667 | 11 |
0.140 | 2336252 | 13 |
0.145 | 654051 | 13 |
0.150 | 1094594 | 10 |
Last trade - 16.10pm 03/07/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |
The Watchlist
TON
TRITON MINERALS LTD
Adrian Costello, Executive Director
Adrian Costello
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online