Phase1design for civil engineering works,includingearthworksanddrainage are complete(Figures2-3).The contract has been agreed and is ready to sign. A formal tender process is under way and work can commence when the contract is awarded.
Phase2designforStructural,Mechanical,ElectricalandProcesscontrolis substantially complete with packages ready for pricing and contracting.
Why would Angolan banks risk their capital with so many uncertainties - ready to sign and then a formal tender process lol
and phase 2 - ready for pricing and contracting lol
Construction if ever gets under way - will be a debacle like the past 3-4 years
Hence SP more than 50% down from last 2022 11c CR
Forget 2025 growing season - time for 27c or 37c fantasy projections to be adjusted downwards
IMO
- Forums
- ASX - By Stock
- MNB
- Ann: Phosphate Fertilizer Project Update
Ann: Phosphate Fertilizer Project Update, page-83
-
-
- There are more pages in this discussion • 351 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MNB (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.4¢ |
Change
0.001(2.33%) |
Mkt cap ! $38.65M |
Open | High | Low | Value | Volume |
4.4¢ | 4.5¢ | 4.3¢ | $15.74K | 353.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 81808 | 4.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.6¢ | 152442 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 81808 | 0.044 |
2 | 138796 | 0.043 |
1 | 305436 | 0.042 |
2 | 163597 | 0.041 |
6 | 506720 | 0.040 |
Price($) | Vol. | No. |
---|---|---|
0.046 | 152442 | 4 |
0.047 | 165190 | 3 |
0.048 | 16279 | 1 |
0.050 | 11700 | 1 |
0.051 | 100000 | 1 |
Last trade - 13.23pm 08/11/2024 (20 minute delay) ? |
Featured News
MNB (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online