Based on Data povided, estimate value of the Big Sandy project:
Above 800 ppm cut-off:
- Total LCE (tonne): 8,020,000 tonnes-
- Value = 8,020,000 tonnes x $12,000/tonne (LCE) = $96,240,000,000
Above 2,000 ppm cut-off:
- Total LCE (tonne): 3,987,500 tonnes-
- Value = 3,987,500 tonnes x $12,000/tonne (LCE) = $47,850,000,000
Total Project Value = Value (Above 800 ppm) + Value (Above 2,000 ppm)= $96,240,000,000 + $47,850,000,000= $144,090,000,000
So, the estimated value of the Big Sandy lithium project is approximately $144.09 billion.
To calculate the value of each share, we can divide the total project value by the number of shares outstanding:Value per Share = Total Project Value / Shares Outstanding= $144.09 billion / 4.5 billion shares= $32.02 per share
Since the mine life is 40 years, we can calculate the annual revenue and profit:Annual Revenue = Total Project Value / Mine Life= $144.09 billion / 40 years= $3.60225 billion per yearAssuming a profit margin of 20% (which is a reasonable estimate for the mining industry):Annual Profit = Annual Revenue x Profit Margin= $3.60225 billion x 0.20= $720.45 million per year
Now, we can calculate the profit per sharerofit per Share = Annual Profit / Shares Outstanding= $720.45 million / 4.5 billion shares= $0.16 per share per yearSince the mine life is 40 years, we can multiply the profit per share by the number of years:
Total Profit per Share = Profit per Share x Mine Life= $0.16 per share per year x 40 years= $6.40 per shareThis represents the total profit per share over the 40-year mine life.
Please note that this calculation is a rough estimate and the actual value of each share may vary based on various market and economic factors.
- Forums
- ASX - By Stock
- AZL
- BLM BIG SANDY APPROVED!
BLM BIG SANDY APPROVED!, page-66
-
-
- There are more pages in this discussion • 276 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
MND
Albemarle lithium downsize burns $200M hole in Monadelphous's pocket as latter's contracts terminated
Add AZL (ASX) to my watchlist
|
|||||
Last
1.7¢ |
Change
0.001(6.25%) |
Mkt cap ! $76.05M |
Open | High | Low | Value | Volume |
1.6¢ | 1.7¢ | 1.6¢ | $26.27K | 1.597M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 3326531 | 1.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.7¢ | 1285095 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
14 | 2870781 | 0.016 |
34 | 7634522 | 0.015 |
22 | 7864186 | 0.014 |
9 | 14658333 | 0.013 |
7 | 2783416 | 0.012 |
Price($) | Vol. | No. |
---|---|---|
0.017 | 1285095 | 4 |
0.018 | 1192655 | 6 |
0.019 | 1284452 | 9 |
0.020 | 2607500 | 13 |
0.021 | 3138874 | 10 |
Last trade - 16.10pm 02/08/2024 (20 minute delay) ? |
Featured News
MND
Albemarle lithium downsize burns $200M hole in Monadelphous's pocket as latter's contracts terminated
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
AZL (ASX) Chart |