ENR 4.17% 34.5¢ encounter resources limited

Ann: Diamond Drilling Commences at Aileron - West Arunta, page-35

  1. 783 Posts.
    lightbulb Created with Sketch. 114
    Nice results released for WA1 Luni today for a 22% rise today so far. Good signs for us here?

    19 JUNE 2024
    WEST ARUNTA PROJECT
    INITIAL METALLURGICAL TESTWORK RESULTS
    Highlights
    ▪ Excellent flotation results demonstrate a high-grade niobium concentrate with
    low impurities and industry comparable recovery rates can be produced from
    Luni oxide mineralisation using a conventional two stage flotation regime
    ▪ Initial flotation test work was completed on sample material from a drillhole
    located in the northeast of Luni
    ▪ Open cycle float tests achieved a high-grade concentrate with excellent recovery:
    Open cycle concentrate (2
    nd cleaner) 51% Nb2O5at 62% recovery
    Open cycle concentrate (4
    th cleaner) 61% Nb2O5 at 52% recovery
    ▪ Subsequent locked cycle testing confirmed the flotation regime performance:
    Locked cycle concentrate (5
    th cleaner) 58% Nb2O5 at 53% recovery
    ▪ Ongoing testwork is aiming to optimise the beneficiation stage including testing
    other process steps used at existing niobium operations, before moving to
    variability testing across Luni

 
watchlist Created with Sketch. Add ENR (ASX) to my watchlist
(20min delay)
Last
34.5¢
Change
-0.015(4.17%)
Mkt cap ! $155.2M
Open High Low Value Volume
33.5¢ 34.5¢ 31.5¢ $397.8K 1.196M

Buyers (Bids)

No. Vol. Price($)
1 9834 32.0¢
 

Sellers (Offers)

Price($) Vol. No.
35.5¢ 2218 1
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
ENR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.