QPM 3.03% 3.4¢ queensland pacific metals limited

Ann: Capital Raising Presentation, page-31

  1. 304 Posts.
    lightbulb Created with Sketch. 33
    It's very easy to work out, just pay attention to when it turns on. TPS never operates on Sunday, when the evening peak is generally below $130/MW.

    Between 3pm and 5:30pm pricing is sub $100, and TPS generally turns on 5-5:30pm and is off by 9:30pm. Therefore it's very easy to conclude that their minimum operational price is >$120/MW, with the preferred price around $150/MW.


 
watchlist Created with Sketch. Add QPM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.