For those of you who haven't seen the new website, I found the paragraphs discussing the Sibayak area interesting and encouraging. (Its probably old news but I wasn't aware of it so it is new to me)
Apparently, PAX is making progress with discussions with the current plant operator at Sibayak (Pertamina Geothermal)for a possible JV.
This area is already producing geothermal power albeit small amounts - 6 out of the 10 production wells are producing.(Total installed capacity is 10.6 MWe (two units of 5.3 MWe)
I would welcome any income stream from Geothermal power as a step in the right direction. (Getting a little tired of seeing only interest revenue from deposits)
Add to My Watchlist
What is My Watchlist?