WKT 0.00% 10.0¢ walkabout resources ltd

Ann: Development Progress - Lindi Jumbo Mine, page-6052

  1. 2,991 Posts.
    lightbulb Created with Sketch. 1120
    It will be a critical Quarterly Report released next month. The raw numbers don't lie. Essentially a full reconciliation is required:

    1) The mining grade control model must be reconciled against the weighted average belt samples in the crushing and grinding circuits of the plant. In that way the performance of the mine can be assessed. Furthermore, the grade control model should be reconciled against the resource model on which the Life of Mine Plan is based. If there is a significant variation towards lower grade or lower flake size distribution, alarm bells should ring.
    2) The plant output must be reconciled against the plant feed to assess recovery and coarse flake preservation - absolutely critical in assessing how well the process plant is performing.

    Spin will not drive the share price, numbers will.
 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
(20min delay)
Last
10.0¢
Change
0.000(0.00%)
Mkt cap ! $67.12M
Open High Low Value Volume
10.0¢ 10.0¢ 10.0¢ $4.33K 43.3K

Buyers (Bids)

No. Vol. Price($)
1 15000 9.8¢
 

Sellers (Offers)

Price($) Vol. No.
10.0¢ 427817 4
View Market Depth
Last trade - 13.25pm 15/08/2024 (20 minute delay) ?
WKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.