ADG 0.00% 0.4¢ adelong gold limited

Ann: Phase 2 Exploration Commences at Paraiba Tenements, page-122

  1. 1,730 Posts.
    lightbulb Created with Sketch. 726
    You might be right about not needing 2 months...perhaps something slightly less like 1.5 - 2 months (having already factored-in that they've sent samples to the lab).

    2 - 3 weeks for results seems unlikely considering ADG have always struggled to deliver results expeditiously. Speed & efficiency isn't their typical modus operandi (even though the deck chairs have been re-arranged slightly at the management level).

    Still no sign of a 'commencement of drilling at Adelong' announcement in CY2024...May'23 was their last drilling completed followed by a 1-year drilling hiatus (and then some). These things usually take time (but usually much longer with ADG).

    Definitely not expecting there'll be any miracles with their delivery times for results.
    Last edited by GravityWaves: 25/06/24
 
watchlist Created with Sketch. Add ADG (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $4.471M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
27 18383940 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 3034974 9
View Market Depth
Last trade - 12.19pm 18/09/2024 (20 minute delay) ?
ADG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.