TM1 9.09% 3.0¢ terra metals limited

Ann: Drilling Confirms Discovery of Large Cu-PGE Sulphide Reefs, page-388

  1. 150 Posts.
    lightbulb Created with Sketch. 4
    The Processing Plant includes, Primary Crusher,Secondary Crusher,Reclaimer,Vertical Roll Mill,Wet Plant,and other infrastructure. 30% completed includes,Civils, Foundation and small amount of construction in my opinion. Still along way to go for us,GR engineering are doing the construction, have a look on their website for design ect. I work for them.
 
watchlist Created with Sketch. Add TM1 (ASX) to my watchlist
(20min delay)
Last
3.0¢
Change
-0.003(9.09%)
Mkt cap ! $11.87M
Open High Low Value Volume
3.3¢ 3.3¢ 3.0¢ $47.55K 1.523M

Buyers (Bids)

No. Vol. Price($)
5 503161 3.0¢
 

Sellers (Offers)

Price($) Vol. No.
3.1¢ 25250 1
View Market Depth
Last trade - 16.10pm 10/09/2024 (20 minute delay) ?
TM1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.