Given that we are expecting news by the end of the month on the pre feasibility Study I am interested in peoples views on the chances you think these guys will make a decison to proceed.
IMO Chances are high based on the current gold price and mining the higher grade deposits first to at least get a pay back period.
Currently IMO no value at all in SP for gold project so can only be positive if decison is yes.
Below is a summary of JORC for each deposit
RNS Number:0937A African Eagle Resources PLC 21 March 2006
African Eagle Resources plc
UPDATED RESOURCE ESTIMATE OF 520,000 OUNCES GOLD
FOR THE MIYABI GOLD PROJECT, TANZANIA
?INFILL AND EXTENSIONAL DRILLING HAS INCREASED THE GLOBAL RESOURCE AT Miyabi to 12.4 million tonnes at 1.3 grams per tonne gold (g/t)
?ESTIMATED TO JORC STANDARDS BY SRK, THE RESOURCE CONTAINS 520,000 ounces of contained gold of which 71% lies in the Indicated category. This represents a 30% increase on the previous estimate.
?NUMEROUS EXPLORATION TARGETS REMAIN TO BE TESTED WITHIN THE MIYABI mineralised corridor, offering the potential for a + 1 million ounce deposit.
African Eagle's continuing drilling programme at Miyabi is designed to improve the statistical confidence in the known ore bodies and to increase the overall resource base. The Company's intentions are to delineate an economic resource which could be brought into production and to demonstrate the existence of additional resources within and near the Miyabi mineralised corridor.
The Company considers that these latest results demonstrate reasonable potential for economic extraction at Miyabi. Future drilling to enlarge the resource will be part of an economic pre-feasibilty study. The metallurgical test results announced on 20th January have already demonstrated that the gold is extractable by conventional leaching.
The new resource estimate was made by SRK Consulting in accordance with the Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code), using data from 30 cored drill holes and 265 RC percussion drill holes. See the technical information section below for details of the methods used and a table of the categorised resource estimates for each of the seven mineralised bodies.
Using a cut-off grade of 0.5g/t, appropriate to Tanzanian deposits of the Miyabi type, the total resource is 12.4Mt at a grade of 1.3g/t, containing 520,000 ounces of gold. Of this, 71% is in the Indicated category.
Grade sensitivity analysis revealed that at 1g/t cut off the resource is 6.3Mt at 1.82 g/t containing 370,000 ounces of gold and at nil cut off the resource is 14.4Mt at 1.15g/t containing 532,000 ounces of gold.
Mark Parker, Managing Director comments "This result increases our geological understanding and brings us much closer to developing a mineable asset, with a good level of confidence. Our Miyabi team's next task is to add significantly to the total by drilling the Ngaya and Shambani South zones, together with new targets identified from recent IP and magnetic surveys. This will lead into an economic feasibility study".
Technical information
Prior to calculating the resource, SRK carried out an audit of the drilling, sampling and assay methods and the quality control checks performed by the Company.
SRK then modelled the gold-bearing zones using block models aligned to the strike. The grades of the blocks were interpolated from the 3m composite drill hole assay data by Ordinary Kriging with search ellipses optimised for each
zone. A cut-off grade of 0.5g/t was applied.
The following table sets out the in-situ Mineral Resource for the seven ore bodies. Classification of the Mineral Resource is based on quality control data, geological continuity and borehole spacing.
Zone Resource category Tonnage (Mt) Grade (g/t) Ounces
Faida Indicated 3,460,000 1.52 170,000
Inferred 960,000 0.89 30,000
Kilimani Indicated 2,610,000 1.40 120,000
Inferred 280,000 1.56 10,000
Shambani Main Indicated 690,000 1.92 40,000
Inferred 180,000 1.74 10,000
Shambani N Indicated 880,000 1.09 30,000
Inferred 350,000 1.06 10,000
Shambani S Inferred 290,000 1.30 10,000
Ngaya Indicated 230,000 1.01 10,000
Inferred 1,460,000 1.06 50,000
North Zone Inferred 960,000 0.80 50,000
TOTAL Indicated 7,880,000 1.45 370,000
Inferred 4,490,000 1.01 150,000
Total 12,370,000 1.29 520,000
Note : appropriate rounding may have resulted in apparent summation errors
John Park
Chairman
African Eagle Resources plc
21 March 2006
Information in this report relating to the estimation of Mineral Resources is based on data compiled by SRK Consulting (UK) Ltd, who act as consultants to the Company. The estimation was supervised by Mr Martin Pittuck whom SRK consider to satisfy the criteria for a Competent Person in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code, 2004). Mr Pittuck has in excess of ten years Mineral Resource experience relevant to the style of mineralisation and type of deposit under consideration and is a full-time employee of SRK. SRK consents to the inclusion of the data in the form and context in which it appears.
For further information, see the Company's web site www.africaneagle.co.uk or contact one of the following:
Mark Parker
Managing Director
+44 20 7248 6059
+44 77 7980 1159
Chris Davies
Operations Director
+44 20 7248 6059
+44 78 6672 9959
Leesa Peters or Pam Spooner
Conduit PR
+44 20 7429 6600
+44 78 1215 9885
This information is provided by RNS
The company news service from the London Stock Exchange
END
MSCPUUCUWUPQGRU
- Forums
- ASX - By Stock
- VYS
- miyabi gold project
miyabi gold project
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VYS (ASX) to my watchlist
(20min delay)
|
|||||
Last
52.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $269.0M |
Open | High | Low | Value | Volume |
53.5¢ | 53.5¢ | 50.5¢ | $782.4K | 1.496M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1400 | 51.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
52.0¢ | 55489 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1400 | 0.515 |
4 | 59800 | 0.510 |
4 | 23485 | 0.505 |
6 | 65679 | 0.500 |
1 | 1011 | 0.495 |
Price($) | Vol. | No. |
---|---|---|
0.520 | 55489 | 2 |
0.525 | 10606 | 1 |
0.530 | 38138 | 2 |
0.535 | 76678 | 1 |
0.540 | 49167 | 3 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
VYS (ASX) Chart |