CYL 3.94% $2.90 catalyst metals limited

Ann: Trident Maiden Reserve Underpins New Low-Cost Development, page-2

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 836 Posts.
    lightbulb Created with Sketch. 67

    Excellent announcement but I cannot copy it here. Clipboard does not work yet it should.

    Does anybody (anybody on this whole messy planet) know how to copy part of a ".pdf" announcement
    and then paste it on to HotCopper and have it appear as we saw it, all nicely formatted and readable?


    Trident Maiden Ore Reserveunderpins new low-cost developmentNew development approach reduces pre-production capital and lowersmine’s development risk•••Trident maiden Ore Reserve includes a small open pit; this new approach lowers both thecost and execution risk of the mine’s developmentCashflows from the open pit reduces the maximum upfront capital drawdown to A$15m,from A$36m noted in Catalyst’s July 2023 Scoping Study1Trident’s key life of mine metrics are:Metric Base case # Spot case (A$3,400/oz)Pre-production max. capital drawdown A$m 19 15AISC (life of mine) A$/oz 1,578 1,592Mine life (LOM) yrs 5.5 5.5Average annual UG production koz 37 37Average annual free cash flow A$m 29 53NPV7 (pre-tax) A$m 100 198IRR (pre-tax) % 146% 327%# Base case price assumptions aligned with Ore Reserve – A$2,700/oz for underground, A$3,200/oz for open pit.Financial figures shown pre-tax due to Trident being only one satellite deposit within Catalyst’s broader portfolio.• Approvals well progressed; first ore targeted mid-2025• Trident’s Resources and Reserves are Mineral Resource estimate: 4.6Mt at 3.5 g/t Au for 524kozo Ore Reserve estimate: 1.3Mt at 4.5 g/t Au for 188koz• Trident ore is to be trucked along the pre-existing haul road to Plutonic’s under-utilisedprocessing plant• Potential to increase Trident’s mine life through infill drilling of 250koz inferred Resourcenot currently included in the mine plan• The revised development approach has a more manageable upfront capital profile;Catalyst’s strong operational cashflows from existing operations, and improving balancesheet, provide it with flexibility to fund Trident’s development
 
watchlist Created with Sketch. Add CYL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.