SPQ 11.1% 1.0¢ superior resources limited

Ann: Commencement of drilling at Steam Engine Gold Project, page-11

  1. 13,830 Posts.
    lightbulb Created with Sketch. 694
    The listed next 10 steps on page 10 can be summarised to show 1-8 are for Steam Engine, 9 for Bottletree (drilling to start) and 10 for Cockie Creek and Wyandotte (preparation of plans to drill), all to be conducted before 1 October as I interpret it.

    The SE resource expansion drilling started today and should take up to 6 weeks to complete. There will be 45 RC drill holes totalling 4,500 metres. Figure 10 has the details. Point 4 on page 10 says that there will be a systematic flow of assays.

    There is a lot to like about this report.

    This section reveals the huge potential for this tenement:

    The SEGP Mineral Resource is developed over a total of 1.2 kilometres of this structure. Gold-in-soil geochemistry indicates that gold mineralisation exists along structures with a total strike length of at least 10 kilometres (Fig. 9). It is evident that significant potential exists to extend gold lode mineralisation along strike to the north and south of the Steam Engine and Eastern Ridge lodes (Fig. 9). Furthermore, strong gold mineralisation exists over a large area at the Windmill East and Origin Prospects, with rock chip assays up to 65.9 g/t Au
 
watchlist Created with Sketch. Add SPQ (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
0.001(11.1%)
Mkt cap ! $20.01M
Open High Low Value Volume
0.9¢ 1.0¢ 0.9¢ $7.808K 783.7K

Buyers (Bids)

No. Vol. Price($)
3 2132750 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 360000 1
View Market Depth
Last trade - 15.56pm 24/07/2024 (20 minute delay) ?
SPQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.