SFX 3.39% 28.5¢ sheffield resources limited

Ann: Increased Production and Shipments at Thunderbird, page-29

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 3,507 Posts.
    lightbulb Created with Sketch. 338
    so 2IC - not having dealt with mineral sands mining before and reading your posts - is this a correct view of how to fix the problem and are they practical in terms of the operation and/cost.

    >12mm oversize screened - can that be staked to one side at the DMU for later "processing" -
    the >2 <12mm similarly can that be retreived by placing additional screens after the spiral process and be stacked for later processing.

    i assume any "later processing" would require a SMALL?? crushing circuit.

    I assume to do this they would need to sample all the oversize atm in each area to get a handle on the grade of it and assess if any of these "remedies"?? would be cost effective

    if not as above and the oversize does have significant grade - how do u fix it

    been watching these guys for years and when under 30c the other day very tempted - but boy i have seen over the years plenty og mining ops fail or have significant headwinds at the start becuase of either too many assumptions or good old geology throws a curve ball which was hard to assess in the DFS

    cheers Nammuldi
 
watchlist Created with Sketch. Add SFX (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.