TG6 0.00% 13.5¢ tg metals limited

Ore sorters, concentrators and iron grade discussion, page-5

  1. 2,890 Posts.
    lightbulb Created with Sketch. 6344
    Among the projects with the worst iron ore conditions to manage is Mineral Resources Wodgina project in the Pilbara region.

    The 2016 flow chart below for Wodgina was using LIMS and WHIMS to manage iron issues. The secondary method used from one previous TG6 posters comments was mining into the pegmatite to avoid any mafic contamination. They have the resource size and the iron problem that they lose part of the resource to ensure less iron issues.
    https://hotcopper.com.au/data/attachments/6292/6292856-b473af4edf65a1fefb122513efa688f2.jpg

    So how big is the iron ore issue at Wodgina?
    Its a big issue. This project has open pit Fe grades of 1.85% (multiplying by 69.9% gets Fe2O3 grades so the pit's at 1.29%). In trying to remove iron, they have created a tailings storage facility that now has 22Mt at 0.96% Li2O. While the tailings is well above normal lithium cut-off's grades, the material has an iron grade of 5.14% Fe (3.59% Fe2O3). Presumably because the Wodgina operation is so concerned about Mafic adding to the already high iron grades at the project, they have assumed a minimum 10m mining width. If those seams were say 20m wide on average - 1m of pegmatite loss on each side of the pegmatite is accepted in avoiding even more Mafic iron issues.

    https://hotcopper.com.au/data/attachments/6292/6292812-9c5672a3508c6124a073ba62d3ca776c.jpg
 
watchlist Created with Sketch. Add TG6 (ASX) to my watchlist
(20min delay)
Last
13.5¢
Change
0.000(0.00%)
Mkt cap ! $9.599M
Open High Low Value Volume
13.5¢ 14.0¢ 12.5¢ $40.03K 299.8K

Buyers (Bids)

No. Vol. Price($)
1 30869 13.5¢
 

Sellers (Offers)

Price($) Vol. No.
14.0¢ 2256 1
View Market Depth
Last trade - 15.37pm 02/09/2024 (20 minute delay) ?
TG6 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.