davo,
You havnt really given your thoughts on the Hazel Creek update.
What did you think ??
It may be of a lower grade so far, but is looking quite large. Bulk tonnage.
Some of the better parts have not even been drilled yet either.
That big untested area in figure 4 at EMCE, looks very interesting.
Maybe the downside is the lack of transport out that way ??
Pity the train line doesnt go up that far.
cheers
Add to My Watchlist
What is My Watchlist?