"Project Energy Connect transmission link from NSW,"
They need this transmision link to take East Coast coal and gas fired power, when the 100% renewables fail.
- Forums
- Political Debate
- South Australia locks in federal funds to become first grid in world to reach 100 per cent net wind and sola
South Australia locks in federal funds to become first grid in world to reach 100 per cent net wind and sola, page-3
Featured News
Featured News
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online