MAY melbana energy limited

Ann: Webinar - Block 9 Field Development Plan, page-146

  1. 306 Posts.
    lightbulb Created with Sketch. 302
    Yes, pointedly as the hole twinned A1 per the Dec 18 spud announcement..

    “Alameda-3 has been designed for the subsurface conditions encountered by Alameda-1 but will otherwise be drilled from the same pad and twin the trajectory of the successful original exploration well.
    Alameda-3 is designed to prove the results of Alameda-1 which, although having considerable oil shows sometimes accompanied by significant formation pressure in both the Alameda and Marti intervals, was unable to conduct flow tests or collect oil samples for analysis. Alameda-3 has been designed to accommodate the subsurface conditions encountered by Alameda-1 and is therefore hoped to lead to an increase in the recoverable resource estimate as well as confirm the presence of a lighter, more valuable oil (see Figure 6).”
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
2.3¢
Change
0.001(4.55%)
Mkt cap ! $77.51M
Open High Low Value Volume
2.2¢ 2.4¢ 2.2¢ $72.25K 3.148M

Buyers (Bids)

No. Vol. Price($)
21 4707267 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 1099217 2
View Market Depth
Last trade - 16.20pm 24/06/2025 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.