gindaldan
also there could be much more to like about gbg in the short term even before okajee is built which will allow for 30mt production capacity in 2014.
mmx is struggling to provide a dfs for its project and if it falls over this`would provide more capacity at geraldton for gbg to step into mmx port allocation providing 10mtpa more capacity for gbg ????
- Forums
- ASX - By Stock
- GBG
- no 1 low risk high reward stock
no 1 low risk high reward stock, page-31
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)