BEZ 7.04% 6.6¢ besra gold inc.

Ann: December 2023 Contract Note, page-72

  1. 154 Posts.
    lightbulb Created with Sketch. 74
    Things to do for the installation of Pilot Plant:
    1. Construction permit from Local Author must be obtained.
    2. Civil Engineering works for drainage and foundations of the plants must start .
    3. Inform Jinpeng the civil engineering work schedule, so that they can apply Malaysian work permit visas for their Chinese technical team to come to site to supervise the installation work in BAU, Malaysia.
    4. Still need to finalize the design and manufacture of the electrical control and system board once the installation works near completion.
    5. As far as I was told, all these actions are being done in the back ground.
    Looking forward for some progress report in Next month.
 
watchlist Created with Sketch. Add BEZ (ASX) to my watchlist
(20min delay)
Last
6.6¢
Change
-0.005(7.04%)
Mkt cap ! $27.59M
Open High Low Value Volume
6.9¢ 6.9¢ 6.6¢ $79.87K 1.189M

Buyers (Bids)

No. Vol. Price($)
9 580388 6.6¢
 

Sellers (Offers)

Price($) Vol. No.
6.7¢ 113 1
View Market Depth
Last trade - 16.10pm 18/07/2024 (20 minute delay) ?
BEZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.