SLX silex systems limited

Nuclear Power Related Media Thread, page-5212

  1. 508 Posts.
    lightbulb Created with Sketch. 40
    "CSIRO has come up with an estimated construction cost for a 1000 MW nuclear plant of at least $A8.6 billion," - So Australia could replace its current fleet of 21 GW of coal-fired power generators fir under $200 billion, and that fleet is currently providing around 60% to 70% of energy to the NEM. Don't confuse generation capacity with energy delivered. You have to apply the capacity factor.

    The estimated LCOE figures of $163/MWh-$264/MWh. I'm pretty sure these are the figures that have been challenged by the Centre for Independent Studies (CIS) because they assume a nuclear power plant has a life of only 30 years (more likely 60 to 80 years) and a capacity factor of a bit over 50% when baseload plants in Australia typically have a load factor of around 75%, which could increase with overnight EV charging and use of pumped hydro systems currently being built.

    "Australia would need to exceed the highest nuclear build rates ever achieved." - Hardly. France had a much more rapid build out of its nuclear fleet in the 70's and 80's.

    In summary, I think the text you appear to have lifted from somewhere is misleading.

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
$4.31
Change
0.225(5.51%)
Mkt cap ! $1.025B
Open High Low Value Volume
$4.20 $4.34 $4.11 $3.109M 729.2K

Buyers (Bids)

No. Vol. Price($)
11 1603 $4.30
 

Sellers (Offers)

Price($) Vol. No.
$4.31 2119 18
View Market Depth
Last trade - 14.48pm 25/06/2025 (20 minute delay) ?
SLX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.