Yes it was monadelphous cheers. My point being they are requiring the extra cash - not just Gina's 20 million - say 30-40 million combined (that would have been part of the total finance package anyway) to advance everything for immediate construction readiness outside of initial 50 million site works.
Just a thought anyway and yes hysteria as we saw with that Dec SPP/CR top up which was to be sufficient to conclude financing and remains on track to do such. I just see they are after early contingency monies to have contractors and materials at the security gate awaiting entry on FID.
Contractors required from additional security, medical officer, Dry mess - Wet mess contractors - social area/pool and gym/gardens built etc - through to bus contractors - small onsite civil team/machinery - workshop persons/supplies/spares - more early construction works - a large workshop/stores and lay down area needs to be built and fenced - Hard stand for water trucks current and future - Diesel quick fill and underground tanks - larger accommodation facilities commencement - vehicles of various requirements - some current roads require sealing etc etc 30-40 million does not go far in remote places. The current monthly cost is quiet substantial - insurance etc ridiculous - sitting on care and maintenance basically - the list is very extensive and it all adds up - some required sooner some later.
Definitely the top 3 you mention in equity along with the other Insto that was there - has been all the way since Dec 22 large SPP. Is there product available or already designated to another offtaker providing equity? possible even if Siemens offtake - such will be demand as you state some offtakers will possibly be positioning themselves early for later supply increase on stage 2 delivery.
Other Insto's - super funds (ARF and as advised those aligned to renewables - environment).
It would not be out of the realms a large auto - US or EU perhaps. Hyundai/Kia certainly locked in substantial supply off takes early.
US Gov - DOD - now relying on one as they have backed Lynas in is not a great strategy. LAMP! Texas plant insufficient supply - MP mess! they'll likely fix in one way or another.
- Forums
- ASX - By Stock
- ARU
- Ann: Trading Halt
Ann: Trading Halt, page-71
-
- There are more pages in this discussion • 61 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ARU (ASX) to my watchlist
(20min delay)
|
|||||
Last
17.5¢ |
Change
-0.005(2.78%) |
Mkt cap ! $431.2M |
Open | High | Low | Value | Volume |
17.5¢ | 18.0¢ | 17.5¢ | $259.6K | 1.482M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
27 | 840464 | 17.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
18.0¢ | 1591119 | 34 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
26 | 823250 | 0.175 |
25 | 707890 | 0.170 |
31 | 1579328 | 0.165 |
45 | 1545989 | 0.160 |
31 | 2338425 | 0.155 |
Price($) | Vol. | No. |
---|---|---|
0.180 | 1566119 | 33 |
0.185 | 1607918 | 37 |
0.190 | 1460576 | 28 |
0.195 | 963545 | 22 |
0.200 | 1633128 | 24 |
Last trade - 12.04pm 11/10/2024 (20 minute delay) ? |
Featured News
ARU (ASX) Chart |
The Watchlist
EL8
ELEVATE URANIUM LTD
Murray Hill, MD & CEO
Murray Hill
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online