The part about plans to build a new plant based on the same design is not true. Please edit that.
They've more or less said they're engaging an engineering consultant to help them fix their design and solve their issues. I'm not saying that will be successful. I do think it will be long and drawn out but maybe I'll be proven wrong. Too late for me, I've already locked in summer huge losses.
- Forums
- ASX - By Stock
- AGY
- Ann: Quarterly Activities Report - June 2024
Ann: Quarterly Activities Report - June 2024, page-75
-
- There are more pages in this discussion • 107 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AGY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $55.32M |
Open | High | Low | Value | Volume |
3.9¢ | 4.0¢ | 3.8¢ | $131.9K | 3.384M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 872154 | 3.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 990329 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 872154 | 0.038 |
5 | 730581 | 0.037 |
25 | 2570708 | 0.036 |
25 | 2584608 | 0.035 |
6 | 1226910 | 0.034 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 990329 | 8 |
0.041 | 670500 | 6 |
0.042 | 998817 | 10 |
0.043 | 1577500 | 3 |
0.044 | 1316726 | 8 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
AGY (ASX) Chart |