WTM 3.95% 39.5¢ waratah minerals limited

Ann: High-Grade Results & Drilling Recommences at Spur Project, page-12

  1. 99 Posts.
    lightbulb Created with Sketch. 198
    Note all the new planned holes are 250m. They are going down dip baby and we know the grade is increasing with depth with copper coming in too. All cheap RC too. This current program should smash it out of the park. I also like the two holes at consoles under that other huge IP anomaly to the north east. Super excited! These lodes look wide enough too with some widening at depth.

    11 and 12 were always going to deliver in my mind as they are the faulted offset of that hotspot in hole 7 to the north. Note they have picked up another parallel fault to the south and is why hole 13 was barren. Need to find the offset further south west.
 
watchlist Created with Sketch. Add WTM (ASX) to my watchlist
(20min delay)
Last
39.5¢
Change
0.015(3.95%)
Mkt cap ! $73.99M
Open High Low Value Volume
38.5¢ 40.5¢ 37.5¢ $361.1K 914.3K

Buyers (Bids)

No. Vol. Price($)
6 37271 38.5¢
 

Sellers (Offers)

Price($) Vol. No.
39.5¢ 31600 4
View Market Depth
Last trade - 15.03pm 05/09/2024 (20 minute delay) ?
WTM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.