IVZ 3.08% 6.3¢ invictus energy ltd

Ann: Mukuyu-2 evaluation update & preparing for flow test, page-85

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 787 Posts.
    lightbulb Created with Sketch. 359
    @huaneng. The general consensus is that M-2ST isn't at the optimum location. We were expecting massive sand bodies in the Lower Angwa, but the top section of the LA at the current location has to be better elsewhere.

    One of the biggest mistakes was to not complete a 3D seismic survey prior to drilling M-1 (or a partial 3D survey over a limited area of interest e.g. 50% including the south, central and northern fault blocks). M-2ST is probably at the periphery of a lacustrine or fluvial sand feature, and so I agree with you, drilling blind has meant the sands at M-2ST are lower quality in terms of thickness, porosity and permeability.

    Compared to the cost of 2 wells, and each necessitating a sidetrack, 3D seismic would have been a fraction of the total cost. Big opportunity missed, yet even in the latest presentations the 3D seismic has hardly been mentioned.

    It would be good to know the flow rate they have set for achieving commerciality?
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
6.3¢
Change
-0.002(3.08%)
Mkt cap ! $95.53M
Open High Low Value Volume
6.5¢ 6.5¢ 6.3¢ $53.57K 849.1K

Buyers (Bids)

No. Vol. Price($)
2 489560 6.3¢
 

Sellers (Offers)

Price($) Vol. No.
6.4¢ 22000 1
View Market Depth
Last trade - 15.35pm 11/11/2024 (20 minute delay) ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.