"A1 will use less than 10 percent of these water rights.", such a green and great project with minimal water use is now delayed so long by the water permit issue, which should have not happened at all. Just feel the bureaucracy in US really needs change. But I think the water permit issue should be concluded anytime from now, maybe an ann will be dropped this week or next
- Forums
- Lounge
- The Froggy Channel.
The Froggy Channel., page-8551
-
- There are more pages in this discussion • 279 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online