Does this mean we'll be producing 30000t cu pa or concentrate equivalent from 1.5mt of ore at $4t cost of refining.This seems to good to be true.Can someone please enlighten me as to where I've gone wrong.
Production modelling based on a throughput of 1.5 million tonnes per annum suggests that the Cyclone Deposit, with feed grades of 1.2% to 1.5% copper, could produce a 16-22% copper concentrate yielding 10,000 to 14,000 tonnes of copper metal annually. Similarly, the Chinook Deposit, with a feed grade of 1.5% copper, could generate a 16-22% copper concentrate, resulting in 15,000 to 16,000 tonnes of copper metal per year.
So 30,000t Cu x $8800pt usd=$260,000,000 less 1.5mtpa x$4pt refining..........na,I need some sleep
- Forums
- ASX - By Stock
- AW1
- AW1 General Chat
AW1 General Chat, page-3772
-
- There are more pages in this discussion • 178 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AW1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $57.00M |
Open | High | Low | Value | Volume |
11.0¢ | 11.5¢ | 11.0¢ | $185.3K | 1.684M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 404407 | 11.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 540032 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 404407 | 0.110 |
13 | 1149200 | 0.105 |
9 | 1918061 | 0.100 |
1 | 100000 | 0.097 |
1 | 200000 | 0.095 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 540032 | 8 |
0.120 | 230000 | 2 |
0.125 | 152500 | 3 |
0.130 | 777500 | 8 |
0.135 | 422095 | 7 |
Last trade - 14.15pm 16/09/2024 (20 minute delay) ? |
Featured News
AW1 (ASX) Chart |