Hello whatsup
The twin drives could work well .
You would need to put the rails back in as I have said many times .
The water was escaping down and old stope into the shaft .
This would need to be fixed .
A rise would need to be put up between levels and the dirt tipped down to the 8 level
.4 months gives them plenty of time ,that's one cut a day on each level and only working one shift .
Dayshift with 3 workers max
The ground there is not very hard so it doesn't take long to bore out a drive 2.5 x 2.5
Good luck guys .
It would be a great little job for some up and coming miners .