CKA 4.46% 7.5¢ cokal limited

Ann: Cokal to Develop Underground Coal Production at the BBM Mine, page-364

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 1,834 Posts.
    lightbulb Created with Sketch. 179
    As per request Coeus: https://cdn-api.markitdigital.com/apiman-gateway/CommSec/commsec-node-api/1.0/event/document/1410-02834637-7CI0BF3TFCDDTRLMFFS14VKO7T/pdf?access_token=00079EUgzU6ELeAUZY389nByrz4d

    If the link doesn't work, check the recent 'Investor Presentation' in the company announcements.

    Slide #3, #5, and Slide #6 - Headings clearly state: 'Cokal is ramping-up production of high-quality metallurgical coal
    from its BBM mine' - not the rubbish you put out that Cokal are pausing production, not sure where you got that from???

    Slide #5:
    Operating Costs (inc. royalties)
    Hard coking coal ~US$135/t FOB | PCI ~US$120/t FOB

    Slide #6:
    BBM Production Analysis a
    ▪ As of April 2024 BBM has produced 42,800t of coal with a combination of LVHCC and PCI (this is part of Seam I
    oxidised coal in Pit 3)
    ▪ As of Q2 2024, BBM had shipped 26,700t of coal product to domestic and export markets.
    ▪ BBM is in the process of ramping-up production from Pit 3 with the arrival of additional mining fleets and equipment
    from the mining contractor, with an additional 3 fleets of 100t class diggers by Q4 2024.
    ▪ The in-pit ROM coal stockpile has been successfully enlarged to accommodate higher production levels. This expanded
    stockpile facilitates direct pit-to-jetty coal transport, reducing rehandling and associated costs while enhancing quality
    control.
    ▪ Near-term infrastructure development to facilitate production ramp-up: Acquire additional fleets of barges; Complete
    the Batu Tuhup permanent jetty; Continue upgrade and development of haul road; transition to Cokal owned
    Intermediate Coal Stockpile at Buntok
    ▪ BBM’s Life of Mine production plan forecasts ramp up to 2 million tonnes of saleable metallurgical coal per annum
    from year 4 onwards.
    However, newly signed infrastructure Joint Ventures have the capacity to material increase
    production capacity, at reduced operating costs

    Plenty of other great things stated in that presentation - have a look at it.
    Last edited by Myke: 05/09/24
 
watchlist Created with Sketch. Add CKA (ASX) to my watchlist
(20min delay)
Last
7.5¢
Change
-0.004(4.46%)
Mkt cap ! $80.92M
Open High Low Value Volume
7.8¢ 7.9¢ 7.5¢ $17.77K 231.9K

Buyers (Bids)

No. Vol. Price($)
1 20000 7.3¢
 

Sellers (Offers)

Price($) Vol. No.
7.8¢ 15360 1
View Market Depth
Last trade - 16.10pm 08/10/2024 (20 minute delay) ?
CKA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.