Off the top of my head I think they were forecasting just over thirty days a well. Half day skid in between at most so that shouldn't be too big a deal.
I would say a sandbagger would estimate 32 days (if I recall correctly) and really be trying to get into the low twenties by the end of the second.
Lets say 51 days for the drills. Aside from a good drill pace I don't anticipate any substantial news aside from how long the wells took perhaps providing some feed for ideas on reduced costs due to pace.
Again by recollection I think they were waiting for six months of water monitoring to be completed, you can't just go straight away and frac them until that six months is in place.
I'm not sure when the water bores were drilled.
The best est will be from the quarterly call that is upcoming!
- Forums
- ASX - By Stock
- TBN
- Shenandoah South 2 Drilling
Shenandoah South 2 Drilling, page-21
-
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TBN (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.8¢ |
Change
0.003(1.72%) |
Mkt cap ! $298.7M |
Open | High | Low | Value | Volume |
14.5¢ | 15.0¢ | 14.5¢ | $15.00K | 103.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
46 | 95627 | 14.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.0¢ | 616679 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
46 | 95627 | 0.145 |
30 | 3624338 | 0.140 |
7 | 357710 | 0.135 |
4 | 66593 | 0.130 |
1 | 8000 | 0.125 |
Price($) | Vol. | No. |
---|---|---|
0.150 | 616679 | 8 |
0.155 | 399468 | 5 |
0.160 | 441716 | 4 |
0.165 | 255000 | 4 |
0.170 | 261291 | 2 |
Last trade - 12.20pm 18/10/2024 (20 minute delay) ? |
Featured News
TBN (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online